
Francis Douglas Memorial College needed a building that could carry sport, assemblies and community events in one space. The purpose built gymnasium and assembly hall in New Plymouth is a large scale multi use facility designed around durability, acoustic performance and flexibility.
The two level building holds a full sports court with retractable tiered seating, a weights room and supporting amenities. Retractable seating is what allows a single space to work for a game one day and a whole school assembly the next.
The building sits at the centre of college life and strengthens the connection across the college community. It was completed in 2026.
Photo Gallery
Other projects